Preliminary project study for the thermal valorization of the sewage sludge of the Aïre waste water treatment plant (750 000 p.e)
Forecasted amount of sludge to be produced : 67 500 t/year at 30% dry matter
Process to install on site : 2 units FMI BR5 (nominal flow capacity : 2 x 4 500kg/h of dewatered sludge) and one ORC to convert unused thermal energy to electricity.
Completion of the preliminary study : April 2020.