SAINT-ETIENNE – FURANIA (France)

Waste water treatment plant of 282 000 p.e. (maximal capacity ) and 233 000 p.e. (rain periods)

Amount of sludge produced : 41 000 t/year at 25% dry matter

Process installed on site : 2 units FMI BR32 (nominal flow capacity : 2 x 2 800kg/h of dewatered sludge).

Starting-up of the process : July 2008

Revamping : October 2019