CREMATORIUM

Waste water treatment plant of 148 000 p.e. located close to the Geneva  lake in front of Switzerland.

Amount of sludge produced : 19000 t/year at 20% dry matter

Process installed on site : 2 units FMI BR22 (nominal flow capacity : 2 x 2 250kg/h of dewatered sludge).

Starting-up of the process : July 2017